Management Consultancy Services for Construction of Lawi Hydropower Project (69MW)


Pakhtunkhwa Hydel Development Organization (PHYDO)


District Chitral

Approx. value of the services provided by firm under the contract (PKR)

Rs. 525 Million

Start Date

June, 2012

End Date

June, 2018

Scope of the project

Preparation of Feasibility Study of Gahrait-Swir Lasht HPP District Chitral. The hydropower site was identified during the identification of hydel potential in northern areas of KP by WAPDA/GTZ. The Technical Details of the scheme are as follows:
Installed Capacity = 340 MW, Q= 410 m3/sec, H = 125 meter